Commissioning and Validation
Thermo Diagnostics Company LLC performs steam quality testing and system audits. We may make piping or repair recommendations for systems operating on steam. The best time to do this is during construction and renovation.
When is steam quality testing required?
According to the ST 79 Standard, testing requirements are "Event Based", not on a schedule:
• Upon installation or relocation of the sterilizer
• After any change to the steam distribution lines or boiler supply water
• When investigating sterilization process failures
• When periodically assessing sterilization loads for wet packs
Many engineering firms have looked to us for guidance on sterile processing steam system design. We offer plan review and commissioning testing.